Plan your transport
Agree with the toolmaker and the recipient which elements the sampling actually requires. A drawing reference helps with allocation; confidential design data does not need to be shared for this. In your schedule, keep the end of machining, readiness for collection and installation at the sampling site apart. We align collection and delivery with these dates and list every package under the tool number with its own count.
What matters
- Clearly separate the insert from the complete mould
- Count packages individually despite a shared tool number
- State end of machining and readiness for collection separately
