Location and handover point
For collection in Hannover, use the actual packed inventory after its previous use. Identify missing, damaged or added parts separately. The Milan recipient confirms the quantity needed, priorities and goods receipt; a previous job or unchanged packing list does not replace that confirmation.
Planning example for this task
For service or exchange moves, separate delivered, removed and returned components. Link each move to its release and reference; the same part number does not necessarily mean the same condition or packaging scope.
Connect two confirmed readiness states
Record collection and destination with separate contacts. The earliest collection time starts after agreed preparation and release; at the destination use the confirmed receiving window. Specify any storage need or changed quantity separately.
What matters
- Confirm the actual goods entrance
- Record contact and handover scope for each site
- Record component and order reference for each package
- Distinguish engineering release from collection readiness
- Clarify receiving authority and cover for each site
