Plan your transport
Preparation includes an overview of the modules and confirmation that draining, cleaning or sealing of open connections is completed before packing. Your specialist department assesses whether residual media are relevant; please share the result in your enquiry. Separate operating parts and fittings get their own line. With several similar modules, labelling by line and installation position helps.
What matters
- Have the module configuration confirmed technically
- State draining and sealed connections in the enquiry
- Label separate operating parts with the line reference
