Plan your transport
List accessories such as connectors, operator panels or cable sets as separate items. Notes on sensitive components come from the responsible technical department and are carried into the order as handling instructions. Software versions and configuration data stay in your internal documentation – an allocation reference is enough for the transport. For an exchange, we clearly distinguish between the replacement delivered and the module that will be returned later.
What matters
- Have engineering or purchasing confirm the physical scope
- Record separate operator panels and cable sets in the packing list
- Give the replacement module and the return their own reference
